A case study of an impactful journey of a customer who switched to LPG, achieving significant cost savings and a drastic improvement in plant environmental.
This case study illustrates the transition of a prominent Transmission Tower and Polymer manufacturer from high-cost LDO to LPG. SUPERGAS provided a tailored 2 X 60 SLOT installation, effectively addressing the company's fuel requirements. The comprehensive approach from the initial proposal, through the meticulous execution, to the final handover highlights the effectiveness of LPG in reducing operational costs. Additionally, it covers the seamless integration of a required burner system to facilitate the switch from liquid to gas fuel, underscoring the project’s success.